Discuss Your Project
GSO SASO High-Temp Aluminium Windows & Doors
Middle East Regional Solutions

GSO SASO High-Temp Aluminium Windows & Doors

50°C Heat Resist | Salt Anti-Corrosion | Sand Dust IP54

Thermal-break frames and solar-control Low-E glass for GCC desert and coastal climates.

GSO / SASOTarget standardU≤2.0 W/m²KProduction target8–12 weeksTypical review cycle

High-Temperature & Corrosion Resistant Aluminum Window & Door Systems

Our high-temperature systems are engineered to GSO SASO, Dubai Municipality, Abu Dhabi UPC, and Saudi Building Code performance thresholds, with thermal, corrosion, and sand-dust data for GCC review.

Certification partnership

Systems are engineered for GSO SASO, Dubai Municipality, Abu Dhabi UPC, and Saudi Building Code targets. We provide thermal simulations, salt-spray data, sand-dust testing, full-size specimens, and installation documentation. Final compliance documentation is issued under the buyer’s company name.

View certification process →
ParameterOur Production TargetGCC referenceGSO / SASOStatus
Thermal TransmittanceU≤2.0 W/m²K≤2.5≤2.1In-house validated
Solar Heat GainSHGC≤0.25≤0.30≤0.25In-house validated
Air Infiltration≤0.3 L/s·m²≤0.5≤0.5In-house validated
Water Penetration600Pa300Pa450PaIn-house validated
Salt Spray Corrosion1000hr500hr720hrIn-house validated

5-Step GCC Compliance Documentation Process

From heat and exposure analysis to GSO SASO and local authority documentation.

01

Requirements review

Review project climate zone, opening sizes, target standard, drawings, and local approval route.

Week 1
02

Test specimen production

Build full-size specimens to the nominated configuration, glazing, hardware, and performance target.

Week 2–4
03

Third-party laboratory testing

Coordinate the applicable accredited laboratory tests and record the performance data required for submission.

Week 5–8
04

Engineering document submission

Prepare calculations, drawings, installation details, declarations, and supporting test documentation.

Week 9–10
05

Local documentation issuance

Support the nominated local authority, notified body, or certification route through final documentation.

Week 11–12

Temperature range, solar control, salt exposure, dust sealing, and project authority requirements are confirmed before final configuration.

View Full Certification Process →

Delivered Regional Project References

Dubai Luxury Villa Middle East project
UAE

Dubai Luxury Villa

U≤2.0 | 186 Units

Abu Dhabi Tower Middle East project
UAE

Abu Dhabi Tower

SHGC 0.20 | 420 Units

Riyadh Compound Middle East project
Saudi Arabia

Riyadh Compound

IP54 | 312 Units

Window & Door Systems for Middle East

Thermal-Insulated GCC Sliding Door

Thermal-Insulated GCC Sliding Door

Thermal-break sliding door engineered for 50°C+ environments with heat-reflective Low-E glass and GSO SASO test specimen support.

Discuss this system →
Solar-Control Fixed Window

Solar-Control Fixed Window

Solar-control fixed window with Low-E glazing engineered to reduce solar heat gain in GCC climates, with SASO energy-efficiency documentation.

Discuss this system →
Sand-Resistant Casement

Sand-Resistant Casement

Sand-resistant casement with triple-seal gasket and dust-resistant hardware engineered for desert air-infiltration requirements.

Discuss this system →
High-Temp Thermal-Break Door

High-Temp Thermal-Break Door

Thermal-break entrance door with UV-stable powder coating engineered for 50°C+ Gulf conditions and GCC building-code submission.

Discuss this system →

Request a Middle East Project Review

Send your drawings, performance targets, and project location. Our engineers will respond within 24 hours.

Start the technical review →

How are the systems specified for 50°C+ climates?

Thermal breaks, Low-E glass, coatings, seals, hardware, and installation details are selected together for the project heat and solar exposure.

Can you support GSO or SASO documentation?

We can prepare thermal simulations, test specimens, salt-spray data, sand-dust information, and engineering documents for the nominated GCC route.

How is sand and dust infiltration controlled?

Casement and sliding configurations can use multi-seal systems, controlled drainage, and hardware selected for desert exposure.

Are coastal GCC projects supported?

Yes. Salt exposure, UV, heat, and wind requirements are reviewed by site, including Dubai, Abu Dhabi, and other Gulf coastal locations.