Project Overview
Engineering Challenge
Full-height glass facade for visual impact; 25-day fast-track delivery; third-party structural performance validation
StarveilBuild Solution
Supplied 240+ units of unitized curtain wall panels with double-glazed low-E glass and commercial-grade automatic entrance doors. 25-day production lead achieved through parallel CNC machining. Third-party ASTM E283 test specimens provided. Certification issued under buyer's brand. FOB Foshan.
Performance Parameters
Delivery & Logistics
240+ units delivered. 25-day production lead.
Project FAQ
StarveilBuild supplied engineering data and test specimens. Final certification is completed under the buyer's own registration path.
Yes. Share drawings, climate zone, and performance targets, and our engineering team will recommend a comparable system within 24 hours.
Shop drawings, product data sheets, test reports, and installation guidance are available for each project.